Contracts were executed with Thompson Engineering in late December 2004 with construction beginning immediately to build a 106,660 SF aluminum fabrication and launch facility. The facility includes a ridge frame metal building consisting of two main fabrication bays with a mezzanine between the bays and a 504 LF sheet pile/relieving platform bulkhead system
Rob’t J. Baggett, Inc. worked closely with Thompson Engineering during the design providing construction and budget analysis.
- 106,660 SF Aluminum Fabrication & Launch Facility
- Rigid Metal Frame Building
- Two Fabrication Bays with Mezzanine Between Bays
- 504LF Sheet Pile/Relieving Platform Bulkhead System