ASPA-Mobile Refrigerated Services-Pier A South Warehouse Renovation

Client:

Mobile Refrigerated Services

Location:

Mobile, AL

Value:

$12,113,849.00

Duration:

Rob’t J. Baggett worked directly for the Construction Managers, Bohnert Construction, to convert the existing Pier A South Warehouse to a reefer warehouse with blast freezers.  Our responsibilities included selective demolition, structural repairs, new insulated concrete slabs on grade, site work with site utilities and construction of two-story office complex located inside the warehouse.

Key Facts:

  • 10,000 SF office facility
  • 111,500 SF facility
  • Heavy concrete work with extreme flatness specifications

Hard deadline because of ship arrival from Russia